DMC Estimating and Project Management Platform

Contract Template Image.JPG

Why 36 Tabs and  Reports?

1.   Each report provides a critical function.

2.   Reports are based upon proper estimating

      and project management needs.

3.   Reports are all linked to each other, making

      it easy to manage a project, allowing a more

      profitable project.  

4.   The reporting simplifies the entire

       estimating and project management

       process, with automatic proposal creation.  

V6.0 Home Center Top Snippet.JPG

Here are the 36 Tabs and Reports: 

       HOME Est and PM

       Project Info (NEW)

       Library (Add and Edit Items With Ease)

       RFI Log

       Alternates

       The Proposal

       Subcontract Template (Furnish and Install)

       Purchase Order (Furnish only)

       Subcontract Template (Install Only)

       The Critical Path Report  (CPR)

       Submittal Hour Report

       Transmittal Tracker (NEW)

       Material Costs Report

       Purchasing Tab (Includes System for Writing a P.O.)

       Cut List Form

       Project Hours Report

       Shop Hours Report

       Install Hours Report

       Shipping Ticket

       G702 (Invoicing)

       G703 Schedule of Values (Invoicing)

       The Close-out and Punch List Report

       The Profit and Loss Report Per Item 

       Production Schedule For Entire Shop or Specific to Project

       Daily Field Report

       

              PLUS

                 Quality Assurance Reports For:

                              Milling (NEW)

                              Assembly (NEW)

                              Sanding (NEW) 

                              Finishing (NEW)

                              Pack/Load (NEW)

                              Unload (NEW)

                              Install  (NEW)

       Check-List to Verify Estimate Accuracy

       File Organization Suggestion

       Forms and Instructions Tab

       No Access (Tab for Programming) (NEW)

Each estimated item is broken down by the following categories:
1.   Itemized Functions
2.   Project Management Hours per Item
3.   Engineering Hours Per Item
4.   Material Costs Per Item
5.   Special material purchases per item
6.   Equipment rental if needed per item
7.   Mill hours per item and function
8.   Assembly hours per item and function
9.   Sanding per item and function
10. Total shop hours per function, total item, and total project
11. Total engineering and project management labor rate per function, item, and total project. 
12. Rate can be changed, automatically. Rate can be changed automatically, per item or total 
      project, with all totals automatically changed. 
13. Total shop, pre-finished labor rate per function, item and total project. Rate can be changed automatically, per item or          total project, with all totals automatically changed. 
14. Total engineering, project management, all shop labor with the ability to change the hourly rate.
15. Total dollar pre-finished cost
16. Cost per function, item and total project for finishing materials
17. Hours per function, item and total project for finishing
18. Dollar costs for finishing, easily adjustable, changing the total function, item, and total project with ease. 
19. Total dollar and hours for finishing, per function, item and total project
20. And many more categories per function, item, and total project:
      total costs for finishing, packing and loading costs, freight, unloading and distribution costs, installation costs per item       and total (fully adjustable), total fabrication and installation per function, item and total, total cost for jobsite meals and       lodging per item, adjustable overhead, adjustable profit, tax column, & grand total per function, item and total project.

 

 